Customize Results:
Male Female

Weight in lbs.


Height
ft   in

Age



The Old Gotthard Tunnel Route - Driver's Eye View

[BE THE FIRST TO RATE THIS MOVIE]
Calorie Rating: 157
Released: 2018-10-01
Running Time: 112 Minutes
Homepage: https://www.video125.com/collections/new/products/the-old-gotthard-tunnel-route
Studios: Video 125,


The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rockā€¦

Director / Directors



Cast

Jonathan Kydd
Character: Narrator


Production and Crew